logo
ProjectRequest For Proposals

RFP/AE: Conklin Raw Water Pond- Pre-Design

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge USA

RMWB requires the pre-design, design and construction administration (optional) phases for the Raw Water Pond in Conklin. The pre-design phase includes the analysis of all the aspects related to potential design and construction of the facility, such as geotechnical work, regulatory compliance in terms of permits and approvals, land acquisition if required and the estimated sizing for the conceptu

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Conklin, Alberta, Canada
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Conklin Raw Water Pond- Pre-Design

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Conklin Raw Water Pond- Pre-Design” is an infrastructure initiative in the Water Supply and Storage sector, located in Conklin, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

request for proposals

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

RMWB requires the pre-design, design and construction administration (optional) phases for the Raw Water Pond in Conklin. The pre-design phase includes the analysis of all the aspects related to potential design and construction of the facility, such as geotechnical work, regulatory compliance in terms of permits and approvals, land acquisition if required and the estimated sizing for the conceptual design (as explained below). The detailed design phase is to be initiated by the project manag...

Procurement method

Location

Country

Canada

State

Alberta

City

Conklin

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project