logo
ProjectClosed

RFP/AE: Consulting Utility Master Plan Update High River

Closed · Alberta · Last reported Mar 2025

Source: Dodge

AB-2025-01873 1. The Town of High River ("High River") is inviting proposals from qualified consulting Engineers to provide services to update the existing High River - Utility Master Plan (the "Services"). 2. The purpose of this Request for Proposals ("RFP") process is to select a qualified consultant to enter into a Site Services Agreement with High River for the performance of the Service. Furt

Status
Closed
Sector
Tunnel, Government, Road, Power Transmission, Commercial, Power Generation (CCGT)
Location
High River, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Consulting Utility Master Plan Update High River

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Consulting Utility Master Plan Update High River” is an infrastructure initiative in the Tunnel sector, located in High River, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

AB-2025-01873 1. The Town of High River ("High River") is inviting proposals from qualified consulting Engineers to provide services to update the existing High River - Utility Master Plan (the "Services"). 2. The purpose of this Request for Proposals ("RFP") process is to select a qualified consultant to enter into a Site Services Agreement with High River for the performance of the Service. Further details about the Service required by High River are set out in Schedule "A" Service Requirem...

Budget

Location

Country

Canada

State

Alberta

City

High River

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Tunnel, Government, Road, Power Transmission, Commercial, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project