logo
ProjectClosed

RFP/AE: Craik Dam Engineering

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Craik Dam was constructed in 1962 by the Prairie Farm Rehabilitation Administration. In 1964 it was handed over to the RM of Craik to own and operate. The dam impounds the Arm River to create a reservoir that is used by irrigators, by the Town of Craik as a domestic water source, for recreation, and as a Regional Park. The dam s existing low-level outlet (LLO) is non-functional, which prevents low

Status
Closed
Sector
Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Car parking, Commercial, Automotive, Hydro, Government
Location
Regina, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Craik Dam Engineering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Craik Dam Engineering” is an infrastructure initiative in the Water Supply and Storage sector, located in Regina, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Craik Dam was constructed in 1962 by the Prairie Farm Rehabilitation Administration. In 1964 it was handed over to the RM of Craik to own and operate. The dam impounds the Arm River to create a reservoir that is used by irrigators, by the Town of Craik as a domestic water source, for recreation, and as a Regional Park. The dam s existing low-level outlet (LLO) is non-functional, which prevents lowering the reservoir level to inspect and maintain other key features such as the embankment dam a...

Budget

Location

Country

Canada

State

Saskatchewan

City

Regina

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Car parking, Commercial, Automotive, Hydro, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project