RFP/AE: Downtown Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Professional engineering firms to provide planning, design, and construction engineering services for the reconstruction of streets, sidewalks, utilities, and parking lots in the downtown Elk River area. The intent is to improve infrastructure condition, enhance pedestrian access and safety, and support the economic vitality of the downtown district. This project seeks to comprehensively address p
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Car parking, Automotive, Power Generation (CCGT), Commercial, Government
- Location
- Elk River, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: Downtown Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Professional engineering firms to provide planning, design, and construction engineering services for the reconstruction of streets, sidewalks, utilities, and parking lots in the downtown Elk River area. The intent is to improve infrastructure condition, enhance pedestrian access and safety, and support the economic vitality of the downtown district. This project seeks to comprehensively address pavement condition, ADA compliance, stormwater management, traffic flow, streetscape enhancements,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Elk River |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Road, Car parking, Automotive, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
