RFP/AE: EA4 Feeder Replacement
Closed · New Mexico · Last reported Apr 2024
Source: Dodge USA
Electrical Engineering for new EA4 Feeder replacement design shall be rated at 25KV (but energized at 15KV), three phase, 4 wire wye, with 477 aluminum conductor steel reinforced (ACSR) phase conductor & 4/0 ACSR neutral and utilize RUS type 115KV construction. The design shall assume the future installation of a 20 pair fiber optic cable. Electrical Engineering for new EA4 Feeder replacement desi
- Status
- Closed
- Sector
- Broadband, Metal, Power Transmission, Steel, Telecommunications, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial)
- Location
- Los Alamos, New Mexico, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: EA4 Feeder Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Electrical Engineering for new EA4 Feeder replacement design shall be rated at 25KV (but energized at 15KV), three phase, 4 wire wye, with 477 aluminum conductor steel reinforced (ACSR) phase conductor & 4/0 ACSR neutral and utilize RUS type 115KV construction. The design shall assume the future installation of a 20 pair fiber optic cable. Electrical Engineering for new EA4 Feeder replacement design shall be rated at 25KV (but energized at 15KV), three phase, 4 wire wye, with 477 aluminum con... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Mexico |
City | Los Alamos |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Broadband, Metal, Power Transmission, Steel, Telecommunications, Power Generation (CCGT), Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
