RFP/AE: Electric Vehicle Charging Stations Supply Construct
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Design and permitting of EV charging Acquisition of charging equipment. Utility coordination, engagement, approval, and planning. Construction of site and installation of charging or fueling equipment. Commissioning of equipment and training staff. Operations of EV charging equipment to be by contractor or third party. Maintenance & repair of EV charging equipment at service levels. All Coordinati
- Status
- Closed
- Sector
- Government, Power Transmission, Power Generation (CCGT), Commercial, Electric Vehicles (EVs), Rail, Automotive, Manufacturing (Industrial)
- Location
- Stockton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Electric Vehicle Charging Stations Supply Construct
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and permitting of EV charging Acquisition of charging equipment. Utility coordination, engagement, approval, and planning. Construction of site and installation of charging or fueling equipment. Commissioning of equipment and training staff. Operations of EV charging equipment to be by contractor or third party. Maintenance & repair of EV charging equipment at service levels. All Coordination for designs and site access must be approved by DCDC. Design approval, installation coordinati... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Stockton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Power Transmission, Power Generation (CCGT), Commercial, Electric Vehicles (EVs), Rail, Automotive, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
