logo
ProjectClosed

RFP/AE: Facility Master Plan at Peaceful Valley

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge

25PAR8169 ENGINEERING AND PLANNING CONSULTANT SERVICES for Parks Infrastructure Assessment and Facility Master Plan at Peaceful Valley PRA - .1 Alberta Parks is seeking a qualified consultant to plan the new future infrastructure of the lower area while evaluating the condition and integrity of the above ground infrastructure and the utility infrastructure located in Peaceful Valley Provincial Rec

Status
Closed
Sector
Tunnel, Road, Power Transmission, Commercial, Car parking, Automotive, Power Generation (CCGT)
Location
Wetaskiwin County No. 10, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Facility Master Plan at Peaceful Valley

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Facility Master Plan at Peaceful Valley” is an infrastructure initiative in the Tunnel sector, located in Wetaskiwin County No. 10, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

25PAR8169 ENGINEERING AND PLANNING CONSULTANT SERVICES for Parks Infrastructure Assessment and Facility Master Plan at Peaceful Valley PRA - .1 Alberta Parks is seeking a qualified consultant to plan the new future infrastructure of the lower area while evaluating the condition and integrity of the above ground infrastructure and the utility infrastructure located in Peaceful Valley Provincial Recreation Area. .2 The project will be delivered through the following phases, further described in...

Budget

Location

Country

Canada

State

Alberta

City

Wetaskiwin County No. 10

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Tunnel, Road, Power Transmission, Commercial, Car parking, Automotive, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project