RFP/AE: Fanny Bay Float Reconstruction
Closed · British Columbia · Last reported Aug 2025
Source: Dodge
In general, work consists of float and breakwater repairs at Fanny Bay Small Craft Harbour. Repairs may include, but are not limited to, the repair and/or replacement of various float components (i.e. decking, bullrails, floatation, etc.), mooring pile well repairs, breakwater recoating
- Status
- Closed
- Sector
- Road, Seaport, Manufacturing (Industrial), Commercial
- Location
- Fanny Bay, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: Fanny Bay Float Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, work consists of float and breakwater repairs at Fanny Bay Small Craft Harbour. Repairs may include, but are not limited to, the repair and/or replacement of various float components (i.e. decking, bullrails, floatation, etc.), mooring pile well repairs, breakwater recoating |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Fanny Bay |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Seaport, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
