logo

RFP/AE: Ferry Kiosks Project

Sector: Power Generation (CCGT) • Location: Jacksonville, Florida, United States of America

Source: Dodge USA

Project
Closed

Permitting and Design for Final Construction Design for Ferry Kiosks. Design services includes Civil, Architectural, Structural, Mechanical, Plumbing, and Electrical plans to construct two (2) ticket booths that can house three (3) employees that will be air-conditioned with a structure located at the Fort George River Ferry Terminal and the another structure located at the Mayport River Ferry Ter

Status
Closed
Sector
Power Generation (CCGT), Government, Commercial
Location
Jacksonville, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Ferry Kiosks Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Ferry Kiosks Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Jacksonville, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Permitting and Design for Final Construction Design for Ferry Kiosks. Design services includes Civil, Architectural, Structural, Mechanical, Plumbing, and Electrical plans to construct two (2) ticket booths that can house three (3) employees that will be air-conditioned with a structure located at the Fort George River Ferry Terminal and the another structure located at the Mayport River Ferry Terminals. Permitting and Design for Final Construction Design for Ferry Kiosks. Design services inc...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Jacksonville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project