logo
ProjectClosed

RFP/AE: Fire Station #1 Replacement

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge

Fire Station 1, located at 177 Highway 20 W, a 30-year-old facility, located in Pelham that the Fire Department has outgrown. Fire Station 1, as it exists today, was substantially completed in 1982, however the grand opening was held on March 5, 1983, to coincide with the 60th anniversary of the Fire Department in Fonthill. The 42-year-old Fire Station is approximately 790m2 (8,500ft2) in area. Th

Status
Closed
Sector
Manufacturing (Industrial), Government, Road, Power Transmission, Commercial, Car parking, Automotive, Power Generation (CCGT)
Location
Pelham, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Fire Station 1 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Fire Station 1 Replacement” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Pelham, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fire Station 1, located at 177 Highway 20 W, a 30-year-old facility, located in Pelham that the Fire Department has outgrown. Fire Station 1, as it exists today, was substantially completed in 1982, however the grand opening was held on March 5, 1983, to coincide with the 60th anniversary of the Fire Department in Fonthill. The 42-year-old Fire Station is approximately 790m2 (8,500ft2) in area. The building contains a garage area utilized for firefighting apparatus and bunker gear storage, tr...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Pelham

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Government, Road, Power Transmission, Commercial, Car parking, Automotive, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project