RFP/AE: FL/DOT: SR 5 Traffic OPS Improvements
Sector: Road • Location: West Palm Beach, Florida, United States of America
Source: Dodge
Reconstruct roadway to include pedestrian and bicycle facilities and safety enhancements. US-1/SR-5 FROM 25TH ST TO 45TH ST SR-5/US-1 FROM 25TH STREET TO 45TH STREET TRAFFIC OPS IMPROVEMENT Length: 1.142 The FDOT may be seeking a consultant to provide preliminary engineering services for US-1/SR-5 from 25TH ST TO 45TH ST Traffic Ops Improvement
- Status
- Prospective
- Sector
- Road, Commercial
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: FL/DOT: SR 5 Traffic OPS Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics, request for proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconstruct roadway to include pedestrian and bicycle facilities and safety enhancements. US-1/SR-5 FROM 25TH ST TO 45TH ST SR-5/US-1 FROM 25TH STREET TO 45TH STREET TRAFFIC OPS IMPROVEMENT Length: 1.142 The FDOT may be seeking a consultant to provide preliminary engineering services for US-1/SR-5 from 25TH ST TO 45TH ST Traffic Ops Improvement |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Commercial |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
