logo
ProjectRequest For Proposals

RFP/AE: FY2025 CDBG Project IQC

One of 10,000+ projects Taiyo tracks in Georgia.

Source: Dodge USA

Engineering preliminary design services required for a potential FY2025 CDBG project and, if funded, for engineering services for the implementation of the project. The purpose of the project is to perform one or more of the follow: street, drainage, water, and/or sewer improvements. Engineering preliminary design services required for a potential FY2025 CDBG project and, if funded, for engineerin

Status
Prospective
Sector
Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government
Location
Darien, Georgia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: FY2025 CDBG Project IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: FY2025 CDBG Project IQC” is an infrastructure initiative in the Water Supply and Storage sector, located in Darien, Georgia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Request for Proposals

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Engineering preliminary design services required for a potential FY2025 CDBG project and, if funded, for engineering services for the implementation of the project. The purpose of the project is to perform one or more of the follow: street, drainage, water, and/or sewer improvements. Engineering preliminary design services required for a potential FY2025 CDBG project and, if funded, for engineering services for the implementation of the project. The purpose of the project is to perform one or...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Georgia

City

Darien

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project