logo

RFP/AE: Ile a La Crosse New Construction

Sector: Residential • Location: Île-À-La-Crosse, Saskatchewan, Canada

Source: Dodge

Project
Closed

The Saskatchewan Housing Corporation (SHC) invites prospective proponents to provide submissions for the construction of a two-storey, semi-detached residential building located at Lot 2, Block 23, Ile a la Crosse SK as further described in the attached documents. Scope of project includes the design and construction of a new two-storey, semi-detached dwelling on crawlspace and associated site wor

Status
Closed
Sector
Residential, Manufacturing (Industrial), Commercial
Location
Île-À-La-Crosse, Saskatchewan, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Ile a La Crosse New Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Ile a La Crosse New Construction” is an infrastructure initiative in the Residential sector, located in Île-À-La-Crosse, Saskatchewan, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Saskatchewan Housing Corporation (SHC) invites prospective proponents to provide submissions for the construction of a two-storey, semi-detached residential building located at Lot 2, Block 23, Ile a la Crosse SK as further described in the attached documents. Scope of project includes the design and construction of a new two-storey, semi-detached dwelling on crawlspace and associated site works.The size shall be limited to 1050 sq feet per unit. Refer to drawings for full extent of the w...

Procurement method

Budget

Location

Country

Canada

State

Saskatchewan

City

Île-À-La-Crosse

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Residential, Manufacturing (Industrial), Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project