RFP/AE: IN/DOT: Warrick County Br 37 Rehabilitation
Sector: Water Supply and Storage • Location: Ohio Township, Indiana, United States of America
Source: Dodge
To perform engineering work on federal aid projects. Warrick County Bridge #37 carries Stanley Road over Wabash & Erie Canal. Remove existing surface through surface milling and hydro demolition Perform full depth patching as required. Install an alternate bid 1 latex modified or silica fume modified rigid deck overlay Clean and paint steel beams and bearings. Extend deck drains to be below bottom
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Hydro, Road, Bridge, Commercial, Metal, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Ohio Township, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: IN/DOT: Warrick County Br 37 Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To perform engineering work on federal aid projects. Warrick County Bridge #37 carries Stanley Road over Wabash & Erie Canal. Remove existing surface through surface milling and hydro demolition Perform full depth patching as required. Install an alternate bid 1 latex modified or silica fume modified rigid deck overlay Clean and paint steel beams and bearings. Extend deck drains to be below bottom beam flange. Replace expansion joints. Install scour countermeasures around piers as required fr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Ohio Township |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Hydro, Road, Bridge, Commercial, Metal, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
