logo
ProjectRequest For Proposals

RFP/AE: Integrated Biorefinery Facility

Request for proposals · Colorado · Last reported Dec 2024

Source: Dodge USA

This project will support the engineering design, procurement, and fabrication of plug-and-play equipment, sized for a production capacity of approximately one barrel per day. The design will prioritize value engineering, operational flexibility, and process safety to maximize scalability and adaptability This project will support the engineering design, procurement, and fabrication of plug-and-pl

Status
Prospective
Sector
Commercial, Power Generation (CCGT), Manufacturing (Industrial)
Location
Golden, Colorado, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Integrated Biorefinery Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Integrated Biorefinery Facility” is an infrastructure initiative in the Commercial sector, located in Golden, Colorado, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Request for Proposals

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will support the engineering design, procurement, and fabrication of plug-and-play equipment, sized for a production capacity of approximately one barrel per day. The design will prioritize value engineering, operational flexibility, and process safety to maximize scalability and adaptability This project will support the engineering design, procurement, and fabrication of plug-and-play equipment, sized for a production capacity of approximately one barrel per day. The design wil...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Golden

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project