logo
ProjectClosed

RFP/AE: KS/DOT: K-5 Offset Alignment Study

One of 10,000+ projects Taiyo tracks in Kansas.

Source: Dodge USA

This project will identify offset alignment options for the reconstruction of 10 miles of K-5, between US-73 and I-435. It includes the removal and replacement of four (4) bridges and two (2) bridge class RCB's. Services associated with this RFP are for Discovery Phase only, with an option to continue the contract through Final Design. Bridge 0105-B0232 Existing Structure - 130' (39'-52'-39') Rein

Status
Closed
Sector
Bridge, Water Supply and Storage, Cement, Waste Processing and Treatment, Road, Commercial
Location
Leavenworth, Kansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: KS/DOT: K-5 Offset Alignment Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: KS/DOT: K-5 Offset Alignment Study” is an infrastructure initiative in the Bridge sector, located in Leavenworth, Kansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will identify offset alignment options for the reconstruction of 10 miles of K-5, between US-73 and I-435. It includes the removal and replacement of four (4) bridges and two (2) bridge class RCB's. Services associated with this RFP are for Discovery Phase only, with an option to continue the contract through Final Design. Bridge 0105-B0232 Existing Structure - 130' (39'-52'-39') Reinforced Concrete Slab Continuous & Haunched (RCSH) Scope: Replacement Bridge 0105-B0265 Existing S...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Leavenworth

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Cement, Waste Processing and Treatment, Road, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project