RFP/AE: Lafleche Dam Interim Spillway Repairs
Request for proposals · Saskatchewan · Last reported Jun 2024
Source: Dodge USA
WSA intends to engage an engineering consultant to complete the following work, summarized at a high level as follows: SCOPE ITEM 1: Design, supply, and install infrastructure necessary to dewater and inspect the Lafleche spillway. Contracting services necessary to complete this work would be subcontracted by the successful respondent. SCOPE ITEM 2: Conduct a detailed inspection of the Lafleche sp
- Status
- Prospective
- Sector
- Hydro, Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Regina, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Lafleche Dam Interim Spillway Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | WSA intends to engage an engineering consultant to complete the following work, summarized at a high level as follows: SCOPE ITEM 1: Design, supply, and install infrastructure necessary to dewater and inspect the Lafleche spillway. Contracting services necessary to complete this work would be subcontracted by the successful respondent. SCOPE ITEM 2: Conduct a detailed inspection of the Lafleche spillway, including subcontracting services as required such as care of water, cleaning, surveying,... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | Regina |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
