logo
ProjectClosed

RFP/AE: Main Street Watermain Engineering

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge USA

proposals from qualified consulting engineering firms to provide field engineering surveys, geotechnical works, detailed design drawings, specifications, construction cost estimates, permitting, and tender documents to construct the replacement of cast iron and asbestos watermains on the south side of Main Street between Ontario Street and County Road 2 (approximately 366 Main Street) including di

Status
Closed
Sector
Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment
Location
Brighton, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Main Street Watermain Engineering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Main Street Watermain Engineering” is an infrastructure initiative in the Metal sector, located in Brighton, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

proposals from qualified consulting engineering firms to provide field engineering surveys, geotechnical works, detailed design drawings, specifications, construction cost estimates, permitting, and tender documents to construct the replacement of cast iron and asbestos watermains on the south side of Main Street between Ontario Street and County Road 2 (approximately 366 Main Street) including directional drilling at the Butler Creek crossing and for full (both lane) asphalt surface restorat...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Brighton

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Water Supply and Storage, Road, Government, Steel, Commercial, Waste Processing and Treatment

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project