RFP/AE: Major Bridge Replacement
Sector: Water Supply and Storage • Location: Edmonton, Alberta, Canada
Source: Dodge USA
REQUEST FOR PROPOSAL (RFP) for ENGINEERING CONSULTANT SERVICES for BF07150-1 MAJOR BRIDGE REPLACEMENT, GRADING, GRANULAR BASE COURSE (GBC), ASPHALT CONCRETE PAVEMENT (APC) AND OTHER WORK HWY 36:02 OVER CHIN COULEE RESERVOIR, SOUTH OF TABER WAC0022035
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Cement, Road, Commercial
- Location
- Edmonton, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Major Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | REQUEST FOR PROPOSAL (RFP) for ENGINEERING CONSULTANT SERVICES for BF07150-1 MAJOR BRIDGE REPLACEMENT, GRADING, GRANULAR BASE COURSE (GBC), ASPHALT CONCRETE PAVEMENT (APC) AND OTHER WORK HWY 36:02 OVER CHIN COULEE RESERVOIR, SOUTH OF TABER WAC0022035 |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Cement, Road, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
