RFP/AE: Marshall Master Plan
Sector: Energy Storage • Location: Marshall, Michigan, United States of America
Source: Dodge USA
The City s Master Plan was adopted in 2015 as an update to the plan and vision adopted in 2008. There have been a number of changes in Marshall since 2008, most notably the recent announcement by Ford of Marshall as the location of the Blue Oval Battery Park. The new Master Plan is envisioned to be both a physical plan and policy guide for staff and decision makers to guide development of the comm
- Status
- Closed
- Sector
- Energy Storage, Car parking, Residential, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Marshall, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Marshall Master Plan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City s Master Plan was adopted in 2015 as an update to the plan and vision adopted in 2008. There have been a number of changes in Marshall since 2008, most notably the recent announcement by Ford of Marshall as the location of the Blue Oval Battery Park. The new Master Plan is envisioned to be both a physical plan and policy guide for staff and decision makers to guide development of the community over the next thirty (30) years. The following topics are expected to be included in the Ma... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Marshall |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Car parking, Residential, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
