logo
ProjectClosed

RFP/AE: Mattie Harrell Playground Replacement

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge USA

  1. Assess needs and design criteria with City s parks maintenance team. 2. Provide a consistent project design team through the full length of the design process. Substitutions need to be submitted in writing to the City and must be approved by the City. 3. Provide schematic drawings, colored elevations, colored perspective, and other suitable material depicting the components to be evaluated. 4.
Status
Closed
Sector
Government, Manufacturing (Industrial), Commercial, Car parking, Automotive
Location
Stockton, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Mattie Harrell Playground Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Mattie Harrell Playground Replacement” is an infrastructure initiative in the Government sector, located in Stockton, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

1. Assess needs and design criteria with City s parks maintenance team. 2. Provide a consistent project design team through the full length of the design process. Substitutions need to be submitted in writing to the City and must be approved by the City. 3. Provide schematic drawings, colored elevations, colored perspective, and other suitable material depicting the components to be evaluated. 4. Apply value engineering/analysis to alternatives including advice on constructability and vandal-...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Stockton

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Commercial, Car parking, Automotive

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project