logo
ProjectClosed

RFP/AE: Mechanical & Electrical Room Upgrades

Closed · Florida · Last reported Aug 2025

Source: Dodge

The purpose of this project is to upgrade the Mechanical and Electrical rooms in Lower Concourse E and E-Satellite (all levels).The professional design services scope includes, but it not limited to, the replacement of existing air handling units (AHU), the modification and/or installation of a new air conditioning system; the replacement of existing panels boards, transformers and circuit breaker

Status
Closed
Sector
Airport, Government, Telecommunications, Power Generation (CCGT), Manufacturing (Industrial), Commercial
Location
Miami, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Mechanical & Electrical Room Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Mechanical & Electrical Room Upgrades” is an infrastructure initiative in the Airport sector, located in Miami, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this project is to upgrade the Mechanical and Electrical rooms in Lower Concourse E and E-Satellite (all levels).The professional design services scope includes, but it not limited to, the replacement of existing air handling units (AHU), the modification and/or installation of a new air conditioning system; the replacement of existing panels boards, transformers and circuit breakers; allowances for structural repairs for the rooms; allowances for expansion of the room's footpr...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Miami

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Airport, Government, Telecommunications, Power Generation (CCGT), Manufacturing (Industrial), Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project