RFP/AE: MI/DOT: US-31 Roadway Reconstruction
Sector: Water Supply and Storage • Location: Manistee, Michigan, United States of America
Source: Dodge USA
Reconstruction of US-31 from 540 feet south of Stronach Road to M-55. The proposed reconstruction work will remove the concrete pavement and restore the surface condition and ride quality to good condition; address drainage issues including curb & gutter, storm sewer, and outlets; replace and upgrade existing sidewalks and paths; and address ADA upgrades as required. Existing 4 lane sections will
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Manistee, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: MI/DOT: US-31 Roadway Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruction of US-31 from 540 feet south of Stronach Road to M-55. The proposed reconstruction work will remove the concrete pavement and restore the surface condition and ride quality to good condition; address drainage issues including curb & gutter, storm sewer, and outlets; replace and upgrade existing sidewalks and paths; and address ADA upgrades as required. Existing 4 lane sections will be evaluated for a lane conversion and other capacity and geometric improvements. No work is anti... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Manistee |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
