RFP/AE: Nenahnezad Substation 2
Sector: Power Generation (CCGT) • Location: Fort Defiance, Arizona, United States of America
Source: Dodge USA
Nenahnezad #2 Substation to NTUA Transmission Line: Legal survey and preliminary rightof-way acquisition for the proposed transmission line is in process by NTUA. Firm shall design, conduct construction planning, plan and coordinate material procurement, and provide project management for 0.4 miles of transmission line with 100 feet of right-of-way from Nenahnezad #2 Substation to NTUA Transmissio
- Status
- Prospective
- Sector
- Power Generation (CCGT), Commercial, Power Transmission, Government
- Location
- Fort Defiance, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Nenahnezad Substation 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Request for Proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Nenahnezad #2 Substation to NTUA Transmission Line: Legal survey and preliminary rightof-way acquisition for the proposed transmission line is in process by NTUA. Firm shall design, conduct construction planning, plan and coordinate material procurement, and provide project management for 0.4 miles of transmission line with 100 feet of right-of-way from Nenahnezad #2 Substation to NTUA Transmission Line. The consultant s invoices shall be broken down into milestones Nenahnezad #2 Substation t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Fort Defiance |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Power Transmission, Government |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
