RFP/AE: New Linden Green Line Park
Sector: Water Supply and Storage • Location: Columbus, Ohio, United States of America
Source: Dodge
Design and construction plans to reclaim the neglected corridor into a linear park, including functional urban greenspace, nature, recreation, and a regionally significant trail offering connectivity to jobs, transit, commercial and cultural destinations, parks, schools, and neighborhoods. Project include 1) Roadway: Bicycle Facility Design 2) Roadway: Non-Complex Roadway Design 3) Right of Way Pl
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Car parking, Waste Processing and Treatment, Bridge, Automotive, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: New Linden Green Line Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | request for proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and construction plans to reclaim the neglected corridor into a linear park, including functional urban greenspace, nature, recreation, and a regionally significant trail offering connectivity to jobs, transit, commercial and cultural destinations, parks, schools, and neighborhoods. Project include 1) Roadway: Bicycle Facility Design 2) Roadway: Non-Complex Roadway Design 3) Right of Way Plan Development 4) Subsurface Utility Engineering 5) Bridge Design: Level 1 and 2 Bridge Design 6)... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Car parking, Waste Processing and Treatment, Bridge, Automotive, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
