RFP/AE: Pressure Based Digester Gas Control System
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The City of Stockton, Municipal Utilities Department (City) is requesting proposals from qualified firms to design a pressure-based cogeneration engine fuel control system to bypass the gas holding unit and transfer digester gas directly to the cogeneration facilities at the WRC. The purpose is to provide redundancy of the gas handling facilities. The City of Stockton, Municipal Utilities Departme
- Status
- Closed
- Sector
- Waste Processing and Treatment, Oil and Gas, Commercial, Power Transmission, Government, Power Generation (CCGT)
- Location
- Stockton, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Pressure Based Digester Gas Control System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Stockton, Municipal Utilities Department (City) is requesting proposals from qualified firms to design a pressure-based cogeneration engine fuel control system to bypass the gas holding unit and transfer digester gas directly to the cogeneration facilities at the WRC. The purpose is to provide redundancy of the gas handling facilities. The City of Stockton, Municipal Utilities Department (City) is requesting proposals from qualified firms to design a pressure-based cogeneration en... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Stockton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Oil and Gas, Commercial, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
