RFP/AE: Protective Permissive Left turn Project Phase 2
Sector: Consumer Products • Location: Lake Forest, California, United States of America
Source: Dodge USA
Engineering Services for the Protected-Permissive Left Turn Phasing Project - Phase 2. Project includes design and implement Protective-Permissive Left Turn ( PPLT ) traffic signal operations at two (2) intersections. The intersections are located at: Alton Parkway and Monarch, Alton Parkway and Catalina. Engineering Services for the Protected-Permissive Left Turn Phasing Project - Phase 2. Projec
- Status
- Closed
- Sector
- Consumer Products, Road, Government, Commercial, Manufacturing (Industrial)
- Location
- Lake Forest, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Protective Permissive Left turn Project Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Engineering Services for the Protected-Permissive Left Turn Phasing Project - Phase 2. Project includes design and implement Protective-Permissive Left Turn ( PPLT ) traffic signal operations at two (2) intersections. The intersections are located at: Alton Parkway and Monarch, Alton Parkway and Catalina. Engineering Services for the Protected-Permissive Left Turn Phasing Project - Phase 2. Project includes design and implement Protective-Permissive Left Turn ( PPLT ) traffic signal operation... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Lake Forest |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
