logo

RFP/AE: Pumpelly Creek Bridge Replacement

Sector: Government • Location: Apalachin, New York, United States of America

Source: Dodge

Project
Closed

Preliminary Design tasks will include but not be limited to preparation of the Design Approval Document (identifying, assessing and selecting a feasible design alternative and its associated impacts), topographic and right-of-way survey and mapping, appraisal and cost evaluation of ROW takings, evaluation of cost and environmental factors and preparation for and attendance at public information me

Status
Closed
Sector
Government, Road, Commercial, Bridge
Location
Apalachin, New York, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Pumpelly Creek Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Pumpelly Creek Bridge Replacement” is an infrastructure initiative in the Government sector, located in Apalachin, New York, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Preliminary Design tasks will include but not be limited to preparation of the Design Approval Document (identifying, assessing and selecting a feasible design alternative and its associated impacts), topographic and right-of-way survey and mapping, appraisal and cost evaluation of ROW takings, evaluation of cost and environmental factors and preparation for and attendance at public information meeting(s). Final Design will include, but not be limited to, ROW Acquisition offers, filing real e...

Procurement method

Budget

Location

Country

United States of America (USA)

State

New York

City

Apalachin

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Commercial, Bridge

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project