logo
ProjectClosed

RFP/AE: Rechlorination Station Design

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Dodge USA

Consulting Engineering Services for the Rechlorination Stations Upgrade (Cape Horn, Pitt River, Clayton) The work includes consulting engineering services for the preliminary design, detailed design, construction and post-construction (the Services ) for the upgrades of the three existing rechlorination stations, Cape Horn, Pitt River and Clayton Rechlorination Stations, including construction of

Status
Closed
Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment
Location
Burnaby, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Rechlorination Station Design

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Rechlorination Station Design” is an infrastructure initiative in the Commercial sector, located in Burnaby, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Consulting Engineering Services for the Rechlorination Stations Upgrade (Cape Horn, Pitt River, Clayton) The work includes consulting engineering services for the preliminary design, detailed design, construction and post-construction (the Services ) for the upgrades of the three existing rechlorination stations, Cape Horn, Pitt River and Clayton Rechlorination Stations, including construction of new buildings to house the new equipment, design and installation of a backup power generation sy...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Burnaby

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project