RFP/AE: South Metershed Phase 2 I&I Improvements
Sector: Water Supply and Storage • Location: Ashville, Ohio, United States of America
Source: Dodge
The Village is seeking professional engineering services to design public improvements that will reduce inflow and infiltration. The design should assess and address the existing conditions of the sanitary sewers, storm sewers, surface drainage and water lines in the project area and any necessary improvements to the sidewalks and roadway intersections. The Village is seeking professional engineer
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial
- Location
- Ashville, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: South Metershed Phase 2 I&I Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Village is seeking professional engineering services to design public improvements that will reduce inflow and infiltration. The design should assess and address the existing conditions of the sanitary sewers, storm sewers, surface drainage and water lines in the project area and any necessary improvements to the sidewalks and roadway intersections. The Village is seeking professional engineering services to design public improvements that will reduce inflow and infiltration. The design s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Ashville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Waste Processing and Treatment, Car parking, Automotive, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
