logo
ProjectClosed

RFP/AE: Sydenham River Slope Stabilization

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge USA

The Municipality of Chatham-Kent is inviting proposals for the procurement of consulting engineering services associated with the preparation of a Municipal Class EA where the level of investigation, consultation and documentation are sufficient to fulfill a Schedule B project, and carry the project through to the conclusion of Phase 5. The work shall include, but is not limited to, re-establishin

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Wallaceburg, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Sydenham River Slope Stabilization

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Sydenham River Slope Stabilization” is an infrastructure initiative in the Water Supply and Storage sector, located in Wallaceburg, Ontario, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Municipality of Chatham-Kent is inviting proposals for the procurement of consulting engineering services associated with the preparation of a Municipal Class EA where the level of investigation, consultation and documentation are sufficient to fulfill a Schedule B project, and carry the project through to the conclusion of Phase 5. The work shall include, but is not limited to, re-establishing the riverbank to a stable incline and providing erosion protection, and developing a strategy t...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Wallaceburg

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project