RFP/AE: Three Bridge/Culvert Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
BRIDGE/CULVERT REPLACEMENT AND OTHER WORK BF 01879 ? Carrying Highway 11:16 Tributary to Tail Creek near Nevis (SE 06-39-21-W4M) Replacement BF 75521 ? Carrying Highway 855:06 over Slough Creek near Halkirk (SW 12-40-16-W4M) Replacement BF 75734 ? Carrying Highway 36:12 over Castor Creek near Castor (NW 06-37-13-W4M) Replacement
- Status
- Prospective
- Sector
- Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial
- Location
- Edmonton, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Three Bridge/Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | BRIDGE/CULVERT REPLACEMENT AND OTHER WORK BF 01879 ? Carrying Highway 11:16 Tributary to Tail Creek near Nevis (SE 06-39-21-W4M) Replacement BF 75521 ? Carrying Highway 855:06 over Slough Creek near Halkirk (SW 12-40-16-W4M) Replacement BF 75734 ? Carrying Highway 36:12 over Castor Creek near Castor (NW 06-37-13-W4M) Replacement |
Procurement method |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Commercial |
Article published date | 2024-02-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
