RFP/AE: Tolbert St. Improvement Project
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge USA
In general, the project will include milling and overlaying approximately 13,000 SY of concrete pavement on Tolbert St, Dogwood Ln, and Pinewood Cir. Other improvements include catch basin replacement and storm sewer repairs, curb ramp and sidewalk replacement, sanitary sewer point repairs, and replacement of approximately 3,045 LF of 6 cast iron waterline with 8 waterline. Engineering design and
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Steel, Government, Commercial, Manufacturing (Industrial)
- Location
- Wadsworth, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Tolbert St. Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the project will include milling and overlaying approximately 13,000 SY of concrete pavement on Tolbert St, Dogwood Ln, and Pinewood Cir. Other improvements include catch basin replacement and storm sewer repairs, curb ramp and sidewalk replacement, sanitary sewer point repairs, and replacement of approximately 3,045 LF of 6 cast iron waterline with 8 waterline. Engineering design and construction professional services for the Tolbert St. Improvement Project. The work will cover T... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Wadsworth |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Steel, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
