logo

RFP/AE: Town of Claresholm 2025 Infrastructure Upgrades

Sector: Government • Location: Claresholm, Alberta, Canada

Source: Dodge

Project
Closed

The Town of Claresholm invites proposals for engineering of the 2025 Infrastructure Upgrades to be completed in the 2025 construction season. The project is to design, engineer, tender and oversee construction of three (3) separate infrastructure projects. 1- Replacement of 192m of 375mm VCP Sewer main 2- Installation of 350m of 200mm Water main 3- Upsize 150m of 150mm AC water main to 200mm PVC p

Status
Closed
Sector
Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage
Location
Claresholm, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/AE: Town of Claresholm 2025 Infrastructure Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Town of Claresholm 2025 Infrastructure Upgrades” is an infrastructure initiative in the Government sector, located in Claresholm, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Town of Claresholm invites proposals for engineering of the 2025 Infrastructure Upgrades to be completed in the 2025 construction season. The project is to design, engineer, tender and oversee construction of three (3) separate infrastructure projects. 1- Replacement of 192m of 375mm VCP Sewer main 2- Installation of 350m of 200mm Water main 3- Upsize 150m of 150mm AC water main to 200mm PVC plus 2200 sq m road replacement. Full details included in RFP document

Budget

Location

Country

Canada

State

Alberta

City

Claresholm

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project