RFP/AE: TX/DOT: Utility Engineering Services
Sector: Power Transmission • Location: Texas, United States of America
Source: Dodge USA
The Texas Department of Transportation may be seeking consultants to provide utility engineering services for the Austin District. Required work may include adjustment coordination, utility relocation design, and utility construction management. *The Texas Department of Transportation may be seeking consultants to provide utility engineering services for the Austin District and statewide. Required
- Status
- Prospective
- Sector
- Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: TX/DOT: Utility Engineering Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Texas Department of Transportation may be seeking consultants to provide utility engineering services for the Austin District. Required work may include adjustment coordination, utility relocation design, and utility construction management. *The Texas Department of Transportation may be seeking consultants to provide utility engineering services for the Austin District and statewide. Required work may include: 1) Utility Engineering Investigation, 2) Utility Adjustment Coordination, 3) U... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
