RFP/AE: Wastewater Treatment Plant Backup Power System
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The ARROW Utilities (ARROW), formerly known as the Alberta Capital Region Wastewater Commission, is requesting proposals from qualified engineering consulting firms who possess the required personnel, experience, and resources for the provision of design and construction management for upgrading its Wastewater Treatment Plant (WWTP) backup power system to mitigate existing electrical utility power
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- Fort Saskatchewan, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/AE: Wastewater Treatment Plant Backup Power System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ARROW Utilities (ARROW), formerly known as the Alberta Capital Region Wastewater Commission, is requesting proposals from qualified engineering consulting firms who possess the required personnel, experience, and resources for the provision of design and construction management for upgrading its Wastewater Treatment Plant (WWTP) backup power system to mitigate existing electrical utility power risks and future growth. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Fort Saskatchewan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Wood Buffalo Wastewater Treatment Plant
- Acden Corporate Headquarters and Fleet Facility
- Wastewater Treatment Lagoon and Collection System Improvements
- Elie Lagoon RipRap Upgrade
- Altona / Rhineland Waste Disposal Ground Expansion
- Treherne Water & Sewer Main Renewal
- Broadway and Mountain Backlane Sewer and Water Replacement Project
- Mountain Avenue and Broadway and Mountain Backlane Sewer and Water Replacement - Phase II
