RFP/AE: Water Distribution Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The preferred scenario identified through the preliminary design includes the removal of the existing PRV on Craigmore Crescent at County Road 19 and the addition of 2 new PRVs, one located on Birch View Trail between Arlberg Crescent and Brooker Boulevard and the other located on Tyrolean Lane east of Craigmore Crescent. This design would also require the extension of the existing water main on C
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Thornbury, Ontario, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/AE: Water Distribution Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | request for proposals |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The preferred scenario identified through the preliminary design includes the removal of the existing PRV on Craigmore Crescent at County Road 19 and the addition of 2 new PRVs, one located on Birch View Trail between Arlberg Crescent and Brooker Boulevard and the other located on Tyrolean Lane east of Craigmore Crescent. This design would also require the extension of the existing water main on Craigmore Crescent to loop the existing water main to Settler?s Way (approx. 80m) and the installa... |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Thornbury |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Commercial, Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
