logo

RFP/AE: Water Supply and Sanitary Lift Station IQC

Sector: Water Supply and Storage • Location: Naperville, Illinois, United States of America

Source: Dodge USA

Project
Closed

consultants provided engineering services such as field surveys, lift station design, elevated water tank design and construction engineering services.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Naperville, Illinois, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/AE: Water Supply and Sanitary Lift Station IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/AE: Water Supply and Sanitary Lift Station IQC” is an infrastructure initiative in the Water Supply and Storage sector, located in Naperville, Illinois, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

consultants provided engineering services such as field surveys, lift station design, elevated water tank design and construction engineering services.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Illinois

City

Naperville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project