RFP/CM: GPO SID Building D Press Room Renovation
Sector: Commercial • Location: Washington, District of Columbia, United States of America
Source: Dodge USA
Construction Management Services for SID Building D Press Room (Pr) Renovation shall provide all labor services, materials, equipment and supervision necessary to perform the renovation and construction to accommodate new manufacturing space in GPO Building D. The project consists of the renovation of the existing 3rd floor of GPO s Building D to accommodate a new 12-color large format press, an I
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Residential, Government
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/CM: GPO SID Building D Press Room Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction Management Services for SID Building D Press Room (Pr) Renovation shall provide all labor services, materials, equipment and supervision necessary to perform the renovation and construction to accommodate new manufacturing space in GPO Building D. The project consists of the renovation of the existing 3rd floor of GPO s Building D to accommodate a new 12-color large format press, an ISO-7 clean room, buildout of future manufacturing space, buildout of secure waste destruction spa... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential, Government |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
