logo
ProjectClosed

RFP/CM: Hickory Campus Renovation Phase 2B

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Construction manager at risk services for the Hickory Campus Phase 2B project This project scope includes the renovation of approximately 36,000 sq. ft. of the 2nd floor of the occupied Hickory Campus building, located at 800 17th Street NW, Hickory, NC 28601. The renovation includes major electrical switch gear, air handler replacements, wet labs, classrooms, student lounge space, faculty lounge

Status
Closed
Sector
Commercial, Education, Power Generation (CCGT), Road
Location
Hickory, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/CM: Hickory Campus Renovation Phase 2B

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/CM: Hickory Campus Renovation Phase 2B” is an infrastructure initiative in the Commercial sector, located in Hickory, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction manager at risk services for the Hickory Campus Phase 2B project This project scope includes the renovation of approximately 36,000 sq. ft. of the 2nd floor of the occupied Hickory Campus building, located at 800 17th Street NW, Hickory, NC 28601. The renovation includes major electrical switch gear, air handler replacements, wet labs, classrooms, student lounge space, faculty lounge space, and conference space. The location of the project is 800 17th Street NW, Hickory, NC. Cons...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Hickory

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Education, Power Generation (CCGT), Road

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project