logo

RFP/CM: I-5 (Yale Ave to SR 55) & (I 405 to Yale Ave)

One of 10,000+ projects Taiyo tracks in California.

Source: Dodge

Project
Closed

The I-5 Improvement Project is located in the cities of Irvine and Tustin. The total length of this project is 4.5 miles. The I-5 Improvement, between Yale Avenue and State Route 55 Project will add an additional General Purpose lane in both directions on the freeway, reestablish auxiliary lanes on the freeway and realign on- and off-ramps throughout the corridor. The project construction will be

Status
Closed
Sector
Manufacturing (Industrial), Road, Government, Consumer Products, Commercial
Location
Orange, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/CM: I-5 (Yale Ave to SR 55) & (I 405 to Yale Ave)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/CM: I-5 (Yale Ave to SR 55) & (I 405 to Yale Ave)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Orange, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The I-5 Improvement Project is located in the cities of Irvine and Tustin. The total length of this project is 4.5 miles. The I-5 Improvement, between Yale Avenue and State Route 55 Project will add an additional General Purpose lane in both directions on the freeway, reestablish auxiliary lanes on the freeway and realign on- and off-ramps throughout the corridor. The project construction will be in accordance with the Caltrans approved PS&E documents for project EA# 12-0K62U4. Construction m...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Orange

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Road, Government, Consumer Products, Commercial

Article published date

2025-03-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project