RFP/CM: KRT New Maintenance Facility
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Vehicle Sales/Service. Owner requests CMAR proposals by December 10 at 3:00 PM (EST) - Design development underway; 60% submission expected November 2026 - Construction scheduled September 2027 September 2029
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Biomass, Power Generation (CCGT), Cable car, Warehouse, Rail, Road, Forest Products and Packaging, Manufacturing (Industrial), Metal, Telecommunications, Residential, Power Transmission
- Location
- Charleston, West Virginia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/CM: KRT New Maintenance Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding, planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Vehicle Sales/Service. Owner requests CMAR proposals by December 10 at 3:00 PM (EST) - Design development underway; 60% submission expected November 2026 - Construction scheduled September 2027 September 2029 |
Original sector | Industry, Trade And Services |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Charleston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Biomass, Power Generation (CCGT), Cable car, Warehouse, Rail, Road, Forest Products and Packaging, Manufacturing (Industrial), Metal, Telecommunications, Residential, Power Transmission |
Article published date | 2026-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
