logo
ProjectClosed

RFP/CM: Utilities Operations Center

Closed · Florida · Last reported Sep 2025

Source: Dodge

The purpose of this RFP is for Construction Management Services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP) and construction of the new Utilities Operation Center located at 360 Davis Road in the Palm Springs Main Water Treatment Plant (the Project ). The Project includes, but is not limited to the pre-construction and construction of an approximately 22,67

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Road, Manufacturing (Industrial), Residential, Power Transmission, Power Generation (CCGT)
Location
Palm Springs, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/CM: Utilities Operations Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/CM: Utilities Operations Center” is an infrastructure initiative in the Water Supply and Storage sector, located in Palm Springs, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The purpose of this RFP is for Construction Management Services consisting of pre-construction services, developing a Guaranteed Maximum Price (GMP) and construction of the new Utilities Operation Center located at 360 Davis Road in the Palm Springs Main Water Treatment Plant (the Project ). The Project includes, but is not limited to the pre-construction and construction of an approximately 22,670 square foot two (2) story Tilt Wall Construction building; the removal and replacement of the e...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Palm Springs

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Road, Manufacturing (Industrial), Residential, Power Transmission, Power Generation (CCGT)

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project