RFP/DB: 5697 CER Energy Storage Upgrade
Closed · California · Last reported Dec 2024
Source: Dodge USA
Design build services for removal of existing 2.5MW Battery System and installation of new 10MW Battery System. The Design Builder shall provide all electrical distribution equipment associated with the installation of the Battery System. The Design Builder shall verify existing power capacity of the selected site, provide and install the Battery System specified by the Center of Energy Research (
- Status
- Closed
- Sector
- Consumer Products, Government, Raw Materials, Power Generation (CCGT), Commercial, Energy Storage
- Location
- San Diego, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/DB: 5697 CER Energy Storage Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design build services for removal of existing 2.5MW Battery System and installation of new 10MW Battery System. The Design Builder shall provide all electrical distribution equipment associated with the installation of the Battery System. The Design Builder shall verify existing power capacity of the selected site, provide and install the Battery System specified by the Center of Energy Research (CER). |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Diego |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Government, Raw Materials, Power Generation (CCGT), Commercial, Energy Storage |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
