RFP/DB: Bainbridge Terminal Improvements Project
Sector: Automotive • Location: Bainbridge, Georgia, United States of America
Source: Dodge USA
The demolition and reconstruction of warehouses and other associated works. Associate works include construction of truck loading canopies, equipment sheds, asphalt paving (new and overlay), gravel road, refurbish existing rail system and re-establish grade (rail bed and ballast), install fire water loop and hydrants, elimination of depressed truck loading area, upgrade the drainage system, demoli
- Status
- Closed
- Sector
- Automotive, Warehouse, Bridge, Rail, Road, Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Bainbridge, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/DB: Bainbridge Terminal Improvements Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The demolition and reconstruction of warehouses and other associated works. Associate works include construction of truck loading canopies, equipment sheds, asphalt paving (new and overlay), gravel road, refurbish existing rail system and re-establish grade (rail bed and ballast), install fire water loop and hydrants, elimination of depressed truck loading area, upgrade the drainage system, demolition of existing conveyor system, procure and install conveyor system, hard car unloaders, and ra... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Bainbridge |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Warehouse, Bridge, Rail, Road, Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
