RFP/DB: Edgewater Flood Improvements - D2
Sector: Water Supply and Storage • Location: Miami, Florida, United States of America
Source: Dodge USA
Design-Build Services for Edgewater Flood Improvements. Project includes design and construction of the Project with 30%, 60%, and final (100%) drawings for installation of a new stormwater pump station, installation of a new drainage system, installation of a new water distribution system, adjusting road elevations, milling and resurfacing, utility coordination, fire hydrant relocation/installati
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial)
- Location
- Miami, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/DB: Edgewater Flood Improvements - D2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design-Build Services for Edgewater Flood Improvements. Project includes design and construction of the Project with 30%, 60%, and final (100%) drawings for installation of a new stormwater pump station, installation of a new drainage system, installation of a new water distribution system, adjusting road elevations, milling and resurfacing, utility coordination, fire hydrant relocation/installation, site preparation, clearing and grubbing, earthwork, harmonization of intersecting side street... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Miami |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Road, Waste Processing and Treatment, Commercial, Manufacturing (Industrial) |
Article published date | 2024-10-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
