RFP/DB: Electric Vehicle Charging Station
Sector: Energy Storage • Location: Cincinnati, Ohio, United States of America
Source: Dodge
Design build services for design and install six (6) Electric Vehicle Charging Stations (EVCS) at the Queensgate Garage for SORTA's Gillig 40 Low Floor Plus Battery Electric Coaches. The design-build project shall include planning, design, permitting, equipment, construction, installation, testing, monitoring, maintenance, support services. Design build services for design and install six (6) Elec
- Status
- Prospective
- Sector
- Energy Storage, Automotive, Car parking, Electric Vehicles (EVs), Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial
- Location
- Cincinnati, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about RFP/DB: Electric Vehicle Charging Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding, pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design build services for design and install six (6) Electric Vehicle Charging Stations (EVCS) at the Queensgate Garage for SORTA's Gillig 40 Low Floor Plus Battery Electric Coaches. The design-build project shall include planning, design, permitting, equipment, construction, installation, testing, monitoring, maintenance, support services. Design build services for design and install six (6) Electric Vehicle Charging Stations (EVCS) at the Queensgate Garage for SORTA's Gillig 40 Low Floor Pl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cincinnati |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Automotive, Car parking, Electric Vehicles (EVs), Manufacturing (Industrial), Power Generation (CCGT), Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
