logo
ProjectClosed

RFP/DB: EV Charging Stations

Closed · California · Last reported Sep 2025

Source: Dodge

Contractors to design, construct, furnish, install, and maintain five (5) Networked Level 2 electric vehicle (EV) charging stations with billing capabilities and ten (10) level 2 make-ready ports at three separate sites. This project includes funding from Peninsula Clean Energy (PCE) from their Member Agency Energy Grant and their EV Ready program. The Engineer s Estimate to design, construct, fur

Status
Closed
Sector
Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Seaport, Manufacturing (Industrial), Commercial
Location
Belmont, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about RFP/DB: EV Charging Stations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: EV Charging Stations” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Belmont, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Contractors to design, construct, furnish, install, and maintain five (5) Networked Level 2 electric vehicle (EV) charging stations with billing capabilities and ten (10) level 2 make-ready ports at three separate sites. This project includes funding from Peninsula Clean Energy (PCE) from their Member Agency Energy Grant and their EV Ready program. The Engineer s Estimate to design, construct, furnish, install, and maintain the three sites. Contractors to design, construct, furnish, install, ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Belmont

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Government, Seaport, Manufacturing (Industrial), Commercial

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project