logo

RFP/DB: FL/DOT: I-75 Fruitville Road Interchange

Sector: Road • Location: Fruitville, Florida, United States of America

Source: Dodge USA

Project
Closed

Reconstruction of the interchange of I-75 (SR 93) at Fruitville Rd (SR 780) as a diverging diamond interchange and the construction of I-75 auxiliary lanes between Bee Ridge Road and Fruitville Road in Sarasota County. The Florida Department of Transportation (FDOT), along with Sarasota County, has identified the need to make improvements to the I-75 / Fruitville Road (SR 780) interchange to impro

Status
Closed
Sector
Road, Commercial
Location
Fruitville, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about RFP/DB: FL/DOT: I-75 Fruitville Road Interchange

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “RFP/DB: FL/DOT: I-75 Fruitville Road Interchange” is an infrastructure initiative in the Road sector, located in Fruitville, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Reconstruction of the interchange of I-75 (SR 93) at Fruitville Rd (SR 780) as a diverging diamond interchange and the construction of I-75 auxiliary lanes between Bee Ridge Road and Fruitville Road in Sarasota County. The Florida Department of Transportation (FDOT), along with Sarasota County, has identified the need to make improvements to the I-75 / Fruitville Road (SR 780) interchange to improve highway operations, safety, and regional mobility. This design project includes reconstruction...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Fruitville

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial

Article published date

2024-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project