RFP/DB: Gasifier
Sector: Power Generation (CCGT) • Location: Swift Current, Saskatchewan, Canada
Source: Dodge USA
design and installation of a Waste to Energy facility utilizing the gasification of organic fibres for the production of combined heat and power with an electrical generation output in the range of 700 kW ? 1 MW
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Government, Commercial
- Location
- Swift Current, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about RFP/DB: Gasifier
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding, pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | design and installation of a Waste to Energy facility utilizing the gasification of organic fibres for the production of combined heat and power with an electrical generation output in the range of 700 kW ? 1 MW |
Procurement method |
Location
Country | Canada |
State | Saskatchewan |
City | Swift Current |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Government, Commercial |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
